Concrete Canvas

Concrete fabric stabilization mat

Concrete Canvas is a cement-impregnated fabric we use to stabilize ditches, channels, and slopes where concentrated flow keeps cutting in and where formed concrete is hard to build safely or efficiently. We shape it to the ground, anchor it in place, and hydrate it so it cures into a thin, durable layer that resists erosion and helps reduce recurring repair work. On GDOT and local-agency projects, we treat it as a drainage and erosion-control detail with a clear purpose: keep water on grade, protect soil and adjacent waterways, and stop small washouts from turning into maintenance headaches. It does not replace proper grading, outlet protection, or a stable subgrade.

What Concrete Canvas is used for

Concrete Canvas is a cement-impregnated fabric we install to help stabilize ditches, channels, and slopes that see concentrated flow. It is a practical option in places where water keeps cutting into soil and where formed concrete is difficult to build safely or efficiently. The material is shaped to the existing grade, anchored, and then hydrated so it cures into a thin layer intended to resist erosion.

On GDOT and local-agency work, we treat Concrete Canvas as a drainage and erosion-control detail. The purpose is straightforward: keep flow on grade, protect soil and adjacent waterways, and help prevent small washouts from becoming recurring maintenance issues. It is not a substitute for proper grading, outlet protection, or stable subgrade, so we start by confirming the planned line, slope, and tie-ins will carry flow the way the design intends.

Good fits in the field

Prep, anchoring, and tie-ins

Performance starts with the base. We look at soil type, moisture, and stability before the material arrives, because Concrete Canvas follows the shape of what it is placed on-good or bad. Soft or pumping subgrade, highly organic material, or saturated pockets may need undercutting, drying time, or a stabilized foundation so settlement does not crack the finished liner or open seams. We shape the ditch or slope to remove high spots, fill voids, and create smooth, continuous contact, then compact to reduce future movement and limit paths where water can get underneath.

Edge treatment is where many failures begin, so we focus on anchoring and tie-ins. That includes adequate edge burial or termination, secure fastening per the plan and manufacturer intent, and seam orientation that respects the direction of flow. On DOT work, we also protect adjacent best management practices during construction while grading, staging material, and working in wet areas. Transitions into riprap, headwalls, aprons, or existing channels need to be tight enough to help prevent scour where velocity changes.

Timing and early follow-up

Concrete Canvas can shorten schedule compared to formed concrete, but it still needs the right window for grading, fastening, hydration, and curing without disturbance. Weather is a real driver in Georgia: light moisture can support curing, but heavy rain during placement can float edges, wash fines, create unsafe footing on slopes, and push water under unsealed terminations. Access and geometry matter too-narrow shoulders, steep slopes, limited staging, and traffic control requirements affect how rolls are moved, where crews can work safely, and how production is sequenced alongside pipe installation, final grading, permanent stabilization, and other erosion-control measures. After installation, early monitoring-especially after the first few runoff events-helps confirm edges, seams, and transitions are holding, debris is not redirecting flow, and inlet and outlet paths remain clear.

CALL
Concrete Canvas
Quote
EMAIL
Concrete Canvas Reviews

Related Services

View All Services >