About two acres of grassing and stabilization along a former railroad corridor in Toombs County.

In October 2026, our crew worked with JA Long to hydroseed about two acres of disturbed ground along the Vidalia Rail Trail. Grading had left long stretches of exposed soil beside the trail. Our job was to put seed and mulch on that ground so vegetation could take root and help hold the soil in place.
The trail follows part of the former Georgia & Florida Railway corridor. Georgia DOT planned it as a route for people walking and biking between downtown Vidalia and Cedar Crossing Road. It’s part of the broader Sweet Onion Rail Trail effort. Georgia DOT project charter · Georgia & Florida Trail overview
From the platform on the hydroseeding truck, our crew sprayed the mix across the sloped ground beside the work area. Hydroseeding applies seed and fiber mulch together in a water-based mix. The mulch helps keep the seed in place while it germinates, and the spray lets the crew follow the changing shape of the bank from the grade beside it. Moses Grass hydroseeding

From overhead, the fresh application shows up as a blue-green strip against the surrounding bare ground. That view makes the limits of the work easy to see. As grass establishes, the new cover is intended to reduce the amount of soil exposed to rainfall and runoff.

Hydroseeding at the Vidalia Rail Trail (53 seconds).
Thanks to JA Long and Georgia & Florida Trail for bringing us in on a project close to home.